Projects

Projects > Northwell Health

Northwell Health

COVID-19 RESPONSE

Phelps Hospital – Northwell Health

Location: 701 N Broadway, Tarrytown, NY 1059
Project Type: Health Care System
Project Category: Mechanical Contracting

Emergency COVID-19 response to convert existing patient rooms into ICU rooms. Nelson Air installed fans and HEPA filters with exterior ductwork and custom window blank offs to allow each room to achieve negative airflow without disturbing any above ceiling services or extended shut downs.


Cohen’s Children’s Hospital – Northwell Health

COVID-19 RESPONSE

Location: 269-01 76th Avenue, New Hyde Park, NY 11040
Project Type: Health Care System
Project Category: Mechanical Contracting

Converted demolished space to serve as a surge ?COVID ICU. ?Designed and built a Exhaust system to create a negative space per DOH guidelines. ?Installed Exhaust fan on adjacent building roof with duct to a costume window plenum and new exhaust distribution ducts throughout.

Contracted to start the AHU replacement program for the Hospital?s OR Suites. The first part of the program includes (3) units; AHU 4, 5& 7. The intent is to replace all five existing AHUs. This work includes installing a temporary / permanent roof mounted AHU to serve the area that AHU 5 serves before it is taken out of commission. Once AHU 5 is completed, a temporary duct from AHU 5 will tie into AHU 4?s duct to serve it?s area, then AHU 4 can be replaced. The above work includes, demolition, concrete, exterior wall modification, new switch installed in an existing cellar switchboard and new feeder run up to MER, 5,000 sq. ft. of a new roofing, structural steel for the roof mounted AHU and structural trestle for the main roof ductwork, heavy protection on the roof for storage of AHU sections and around new roofing work, mechanical, plumbing work that includes new vents and roof drains, BMS, waste removal, clean up and laborers. -Installed/Built (2) Air Handling Units(AHU) that server OR’s, Installed one Rooftop?Unit(RTU) on that will server?as a temp (RTU) to server OR’s/floors while other AHU’ or RTU’s are being replaced in the future

More Projects

Contracted to start the AHU replacement program for the Hospital?s OR Suites. The first part of the program includes (3) units; AHU 4, 5& 7. The intent is to replace all five existing AHUs. This work includes installing a temporary / permanent roof mounted AHU to serve the area that AHU 5 serves before it is taken out of commission. Once AHU 5 is completed, a temporary duct from AHU 5 will tie into AHU 4?s duct to serve it?s area, then AHU 4 can be replaced. The above work includes, demolition, concrete, exterior wall modification, new switch installed in an existing cellar switchboard and new feeder run up to MER, 5,000 sq. ft. of a new roofing, structural steel for the roof mounted AHU and structural trestle for the main roof ductwork, heavy protection on the roof for storage of AHU sections and around new roofing work, mechanical, plumbing work that includes new vents and roof drains, BMS, waste removal, clean up and laborers. -Installed/Built (2) Air Handling Units(AHU) that server OR’s, Installed one Rooftop?Unit(RTU) on that will server?as a temp (RTU) to server OR’s/floors while other AHU’ or RTU’s are being replaced in the future

Back to Projects
Privacy Settings
We use cookies to enhance your experience while using our website. If you are using our Services via a browser you can restrict, block or remove cookies through your web browser settings. We also use content and scripts from third parties that may use tracking technologies. You can selectively provide your consent below to allow such third party embeds. For complete information about the cookies we use, data we collect and how we process them, please check our Privacy Policy
Youtube
Consent to display content from Youtube
Vimeo
Consent to display content from Vimeo
Google Maps
Consent to display content from Google