North Central Bronx Hospital?
Nelson Air fabricated and installed 55,000 lbs of tin (ductwork), fitout four floors, installed three new air handling units (AHU), installed two heat exchangers, installed multiple variable air volume systems (VAV) & fan coil units (FCU) for multiple floors, and installed 10 condensing units with multiple evaporators.

Find out more.
We are devoted to collaborating with our clients.